move node data to a backuppool (cart) with the same dev class as the copypool has....
regards joachim -----Ursprüngliche Nachricht----- Von: Warren, Matthew (Retail) [mailto:[EMAIL PROTECTED] Gesendet: Mittwoch, 7. Januar 2004 12:10 An: [EMAIL PROTECTED] Betreff: delete a specific nodes data from a copy stg pool Hi TSM'ers I need to delete the data for a specific node from a certain copy pool. Originally the following process was occurring; Turn co-location on for the pool Move node data within the pool Turn off co-location for the pool Delete the written volumes discard=yes Now, I thought I could do this instead; Creat new copystg pool Move node data from old copypool to new copypool Delete the volumes in the pool Unfortunatley TSM doesn't let you move nodedata from one copy pool to another. Is the first method the most effective way of achieving this, or is there a simpler / quicker / less fiddly way? Thanks, Matt. ___________________________ Disclaimer Notice __________________________ This message and any attachments are confidential and should only be read by those to whom they are addressed. If you are not the intended recipient, please contact us, delete the message from your computer and destroy any copies. Any distribution or copying without our prior permission is prohibited. Internet communications are not always secure and therefore the Powergen Group does not accept legal responsibility for this message. The recipient is responsible for verifying its authenticity before acting on the contents. Any views or opinions presented are solely those of the author and do not necessarily represent those of the Powergen Group. Registered addresses: Powergen UK plc, 53 New Broad Street, London, EC2M 1SL Registered in England & Wales No. 2366970 Powergen Retail Limited, Westwood Way, Westwood Business Park, Coventry CV4 8LG. Registered in England and Wales No: 3407430 Telephone +44 (0) 2476 42 4000 Fax +44 (0) 2476 42 5432