[ https://issues.apache.org/jira/browse/HIVE-26770?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Work on HIVE-26770 started by Akshat Mathur. -------------------------------------------- > Make "end of loop" compaction logs appear more selectively > ---------------------------------------------------------- > > Key: HIVE-26770 > URL: https://issues.apache.org/jira/browse/HIVE-26770 > Project: Hive > Issue Type: Improvement > Reporter: Akshat Mathur > Assignee: Akshat Mathur > Priority: Major > Labels: pull-request-available > Time Spent: 4h 40m > Remaining Estimate: 0h > > Currently Initiator, Worker, and Cleaner threads log something like "finished > one loop" on INFO level. > This is useful to figure out if one of these threads is taking too long to > finish a loop, but expensive in general. > > Suggested Time: 20mins > Logging this should be changed in the following way > # If loop finished within a predefined amount of time, level should be DEBUG > and message should look like: *Initiator loop took \{ellapsedTime} seconds to > finish.* > # If loop ran longer than this predefined amount, level should be WARN and > message should look like: *Possible Initiator slowdown, loop took > \{ellapsedTime} seconds to finish.* -- This message was sent by Atlassian Jira (v8.20.10#820010)