The current target is the early target date (18 April).
Action summary
Accepted blockers
-
1. shim — Live image made with BOOTX64.EFI from latest shim-x64-15.6-2
fails to boot on some boards — NEW
ACTION: kernel upstream to merge NX support
Proposed
The current target is the early target date (18 April).
Action summary
Accepted blockers
-
1. kernel — anaconda failed to detect the fcoe target(only affects ixgbe) — NEW
ACTION: Maintainers to diagnose issue
NEEDINFO: lnie
2. plasma-workspace — Logging out
The current target is the early target date (18 April).
Action summary
Accepted blockers
-
1. crypto-policies — Insecure installed RPMs (like Google Chrome)
prevent system updates in F38, can't be removed — ASSIGNED
ACTION: Maintainers to propose solution
The current target is the early target date (18 April).
Action summary
Accepted blockers
-
1. fcoe-utils — anaconda failed to detect the fcoe target(only affects
ixgbe) — NEW
ACTION: Maintainer to diagnose issue
NEEDINFO: cleech
2. gnome-calendar — After a
F38 Beta is go, so it's time to look at final blockers. The current
target is the early target date (18 April).
Action summary
Accepted blockers
-
1. fcoe-utils — anaconda failed to detect the fcoe target(only affects
ixgbe) — NEW
ACTION: Maintainer to
The current target release date is the early target date (2023-03-14).
The Go/No-Go meeting will be Thursday!
Action summary
Accepted blockers
-
1. distribution — Workstation boot x86_64 image exceeds maximum size — POST
ACTION: gdb maintainers to remove the
The current target release date is the early target date (2023-03-14).
Action summary
Accepted blockers
-
1. distribution — Workstation boot x86_64 image exceeds maximum size — ASSIGNED
ACTION: Workstation WG to reduce image size or increase the limit
2.
On Fri, 2023-02-17 at 14:45 -0500, Ben Cotton wrote:
> The F38 Beta freeze begins on 21 February. The current target release
> date is the early target date (2023-03-14).
>
> Action summary
>
>
> Accepted blockers
> -
>
> 1. distribution — Workstation boot
The F38 Beta freeze begins on 21 February. The current target release
date is the early target date (2023-03-14).
Action summary
Accepted blockers
-
1. distribution — Workstation boot x86_64 image exceeds maximum size — ASSIGNED
ACTION: Workstation WG to
On Fri, Feb 10, 2023 at 5:52 PM Adam Williamson wrote:
>
> On Fri, 2023-02-10 at 08:47 -0500, Ben Cotton wrote:
> >
> > Accepted blockers
> > -
> >
> > 1–3. distribution — {Workstation,Everything,Server} boot x86_64 image
> > exceeds maximum size — ASSIGNED
> > ACTION: Relevant
On Fri, 2023-02-10 at 08:47 -0500, Ben Cotton wrote:
>
> Accepted blockers
> -
>
> 1–3. distribution — {Workstation,Everything,Server} boot x86_64 image
> exceeds maximum size — ASSIGNED
> ACTION: Relevant Teams to reduce image size or increase the limit
>
> Accepted blockers
>
11 matches
Mail list logo