Burj Dubai tallest tower will open 9 sept.2009

Burj Dubai, the world's tallest man-made structure, will see a soft
opening on September 9 this year in tandem with the launch of Dubai
Metro, according to an industry source.
The target is to have the event coincide with the opening of the Metro
on 09/09/09, a person close to the matter told Emirates Business.
There is still work to be done in terms of finishing the building, the
person said. This includes the access and exit planning as well as
connecting the sewerage lines to the main network.
These issues are being addressed to ensure optimum working of the
building before final occupancy, the person said.
Despite several attempts, developer Emaar Properties did not comment
on the subject by the time this newspaper went to press.
The groundbreaking for Burj Dubai took place in September 2004 and
completion was projected by late 2008. In June 2008, Emaar Chairman
Mohamed Ali Alabbar said in a statement: We believe that a completion
date of September 2009 is possible and reasonable for a project of
this global magnitude and significance.
Burj Dubai has risen to its final height of 818 metres, a project
contractor told this newspaper in a recent interview. The spire was
erected in the third week of December. Since then, a beacon has been
installed at the top, usually the final topping-out of a tower.
When completed, Burj Dubai will meet all four criteria listed by the
Council on Tall Buildings and Urban Habitat (CTBUH), which classifies
the world's tallest structures. CTBUH measures the height of buildings
to the structural top, the highest occupied floor, the top of the roof
and the tip of the spire, pinnacle, antenna, mast or flagpole.
Contractor Besix said it is working to complete the work on schedule.
We signed a new agreement with Emaar Properties last year and they
gave us an extension of time to complete the project in 2009, said
Didier Bosredon, Deputy Project Director at Besix.
The 154th floor will house the office of the Emaar chairman. The
façade is still not finished and work is in progress, he said.
Besix is working jointly with Samsung and Arabtec as the main
contractors on Burj Dubai.
The tower will have an observation deck on Level 124, which will offer
visitors a bird's-eye view of the city and beyond.
Burj Dubai is part of the $20 billion (Dh73.47bn) Burj Dubai
development, which includes a shopping mall, hotels and a variety of
residential buildings.

Read more articles at

http://donnieproperties.blogspot.com


--~--~---------~--~----~------------~-------~--~----~
JOIN THE FASTEST GROWING DUBAI REAL ESTATE NETWORK
http://www.MyDubaiNetwork.com

=================================================

To post to this group, send email to value-homes-dubai@googlegroups.com

To join this group visit: http://groups.google.com/group/value-homes-dubai
=================================================
TO EDIT HOW MANY EMAILS YOU SHOULD GET FROM THIS GROUP..

GO TO http://groups.google.com/group/value-homes-dubai

THEN GO TO "EDIT MY MEMBERSHIP" AND CHANGE IT.
-~----------~----~----~----~------~----~------~--~---

Reply via email to