Hi! I have setup replication with one master and one slave. What do I have to think about in order to minimize hassle and downtime to switch this setup to a new master?
My thought was to setup the new master as a slave, and then switch to the new master. Is this a nice way of doing it? -- patrik_wallstrom->foodfight->[EMAIL PROTECTED]>+46-733173956 `-> http://www.gnuheter.com/ -- MySQL General Mailing List For list archives: http://lists.mysql.com/mysql To unsubscribe: http://lists.mysql.com/[EMAIL PROTECTED]