Hi!

I have setup replication with one master and one slave.
What do I have to think about in order to minimize hassle
and downtime to switch this setup to a new master?

My thought was to setup the new master as a slave, and
then switch to the new master.

Is this a nice way of doing it?

-- 
patrik_wallstrom->foodfight->[EMAIL PROTECTED]>+46-733173956
                `-> http://www.gnuheter.com/

-- 
MySQL General Mailing List
For list archives: http://lists.mysql.com/mysql
To unsubscribe:    http://lists.mysql.com/[EMAIL PROTECTED]

Reply via email to