James Gates wrote: > I've attached the fast track proposal and a completed FOSS checklist > (LSARC/2008/061). This case does not qualify for self review as there > are several "ARC review required" answers in the checklist. But I've > added an explanation beneath each of these answers. > > All questions can come to me. Timeout is set for next Thursday (18th). I took a look and things look fine to me. Other than a (now) broken link to the old caselog site in your References section, I saw little difference between this and 2008/004 (no surprise). Why is EOF of 8.2 out of scope, though? Was the EOF of 8.1 predicated on being >2 releases old or because the db formats weren't compatible (and/or ENOEASYUPGRADE)?
I noted that there was approximately 0 discussion on the 8.3 case (2008/004), and no FOSS checklist then. That saddens me, somewhat, as I am delighted to see Sun actually in lock-step with this particular technology despite 2 very recent DB mergers, and I hope others are at least a little excited about this particular product.