Re: [j-nsp] EX8200 VirtualChassis versus Cisco VSS

2013-08-13 Thread Billy Sneed
The EX8200 Virtual-Chassis w/ a couple of the XRE200's does well. The XRE's act as the control plane and the 8200's end up just being linecards. It's a bit hack-ish IMHO w/ a EX2200 switch acting as the glue between each XRE and the 8200. We've run 11.2 - 11.4 and pleased w/ the stability. Our

Re: [j-nsp] How reliable is EX multichassis? 3300 and 8200 switches

2012-11-02 Thread Billy Sneed
On 11/02/2012 02:21 AM, Luca Salvatore wrote: Confirmed as a bug. AE interfaces flap when master switch in VC reboots. Fixed in 11.4r6 (not released yet) or 12.1 Luca Do you have the PR# by chance, or any info I can read up on at juniper.net? ___ ju