thanks
-----Original Message----- From: Steve Leyton <[email protected]> To: sprinklerforum <[email protected]> Sent: Wed, Sep 19, 2012 2:18 pm Subject: Excellent comments from a smart guy Forumites: A fire official here in SoCal asked me to forward his comments on urrent topics, as he's having a problem getting his replies to post to he forum: * According to 2010 California Building Code Section 310 halfway ouses are classified as either Group R-2.1 or Group R-4 occupancies epending on the ambulatory status of the clients. Referring then to ection 903.2.8 it specifically prohibits a 13D system in Group R-2.1 & -4 occupancies. Halfway houses must utilize a full 13 system. * Basement Storage in Multi-Residential: According to the Building ode the common storage area located in the basement of a Group R-2 ulti-residential building such as apartments or condos would be a Group -1 occupancy which must be separated from the R-2 by one-hour fire arriers. While the R-2 may be protected by a 13R system, the S-1 must e protected by a full 13 system. Galen Taylor Fire Prevention Engineering Assistant County of Los Angeles Fire Department Fire Prevention Engineering - Special Projects 323-890-4125 [email protected] -------------- next part -------------- n HTML attachment was scrubbed... RL: <http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120919/b1ff6758/attachment.html> ______________________________________________ prinklerforum mailing list [email protected] ttp://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum -------------- next part -------------- An HTML attachment was scrubbed... URL: <http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120919/b7c0a46a/attachment.html> _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum
