thanks



-----Original Message-----
From: Steve Leyton <[email protected]>
To: sprinklerforum <[email protected]>
Sent: Wed, Sep 19, 2012 2:18 pm
Subject: Excellent comments from a smart guy


Forumites:
 
A fire official here in SoCal asked me to forward his comments on
urrent topics, as he's having a problem getting his replies to post to
he forum:    
 
*       According to 2010 California Building Code Section 310 halfway
ouses are classified as either Group R-2.1 or Group R-4 occupancies
epending on the ambulatory status of the clients. Referring then to
ection 903.2.8 it specifically prohibits a 13D system in Group R-2.1 &
-4 occupancies. Halfway houses must utilize a full 13 system. 
 
*       Basement Storage in Multi-Residential: According to the Building
ode the common storage area located in the basement of a Group R-2
ulti-residential building such as apartments or condos would be a Group
-1 occupancy which must be separated from the R-2 by one-hour fire
arriers. While the R-2 may be protected by a 13R system, the S-1 must
e protected by a full 13 system. 
 
Galen Taylor
Fire Prevention Engineering Assistant
County of Los Angeles Fire Department
Fire Prevention Engineering - Special Projects
323-890-4125
[email protected]
 
 
-------------- next part --------------
n HTML attachment was scrubbed...
RL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120919/b1ff6758/attachment.html>
______________________________________________
prinklerforum mailing list
[email protected]
ttp://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20120919/b7c0a46a/attachment.html>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to