You could use a TSM script like:

ba stgpool stgpool1 offsite wait=y
update stgpool stgpool1 highmig=1 lowmig=1

and setup a schedule to run the script

-----Original Message-----
From: Dearman, Richard [mailto:[EMAIL PROTECTED]]
Sent: Monday, March 25, 2002 10:38 AM
To: [EMAIL PROTECTED]
Subject: Copy Stgpool and Migrations


I backup my systems to a disk stgpool then backup that stgpool to an offsite
copy stgpool library at 8am then at 11am I migrate the disk stgpool to an
onsite tape library.  Currently I schedule the jobs in tsm by just issuing
the proper commands at 8am and 11am.  The problem is my 8am backup to my
copy stgpool sometimes runs into the migrattion at 11am.  Does anyone have a
more efficient way of doing this instead of me just changing the migration
to a later time.

Thanks
Richard

Reply via email to