We've done this. Essentially, yes it is just a matter of loading the firmware and re-cabling the drives. However, this is not something that you can do yourself--at least we couldn't at the time we purchased the upgrade. The price of the upgrade included an IBM field engineer coming on site to perform the upgrade. Perhaps that's why it is so pricey? Although I never confirmed it, I'm guessing the requirement to have a field engineer come on-site was to protect the integrity of the code.
Matt Zufelt >>> [EMAIL PROTECTED] wrote on 4/11/2005 12:26 PM: > Anyone out there done an upgrade of an IBM 3583 library without the > multi-path feature to the multi-path feature? > > > > It is just a matter of pulling out the library module, loading the > multi-path firmware and re-cabling the drives? This is SCSI > attached to a p550. The client is putting a fibre attached LTO-3 drive > in this library with 3 other LTO-1 drives. Backups > specifically for a 1.2TB application. > > > > Hopefully the MES upgrade will come with some documentation. > > > > Bill Boyer > > "Growing old is mandatory, growing up is optional" - ??