On 12/3/20 9:51 AM, Gino A. Villarini wrote:
IIRC they were inspecting the cables on a daily basis
I always though the cables draped over the pylons like suspension bridge style, but nope, it was separate cables terminating between platform-pylon and pylon-ground. I wonder if it would have been possible to replace the cables if they were just passing over instead of terminating on top of the pylon.
-- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com