But then what costs more, the PE or the concrete? 



----- 
Mike Hammett 
Intelligent Computing Solutions 
http://www.ics-il.com 



Midwest Internet Exchange 
http://www.midwest-ix.com 


----- Original Message -----

From: "Chris Fabien" <[email protected]> 
To: [email protected] 
Sent: Wednesday, May 13, 2015 6:34:24 AM 
Subject: Re: [AFMUG] guy wire anchors again 


Yea the rohn design is probably overkill for most sites. They design it with 
worst possible soil in mind. If you want to change it the "right answer" is get 
a PE to design it for you. 
On May 12, 2015 10:18 AM, "Brandon Yuchasz" < [email protected] > wrote: 





So I am planning the replacement on one guy wire anchor next week. The anchor 
rod that goes into the concrete and other parts are on the way. I am lining up 
the small excavator concrete and so on. Rohn calls for a 6’x 4’x 1.5’ slab of 
concrete buried 4 feet under the surface of the ground. This is a 100’ Rohn 45. 
I am all for doing things right but that seems huge to me. We have a very rocky 
soil up here and at one site actually anchored into bed rock. This site we 
won’t have that option but I suspect we will be digging through broken rock and 
dirt the entire way. Its an old mining area and this site sits where they 
pilled the “poor rock” that came out of the mine shafts. Its all over up here . 
They have not mined in this area in 100 years so the soil is quite stable im 
not concerned about that. Just wanted to get your thoughts on the size of this 
anchor. We will have to mix the concrete on site no way to get a truck in. 