I found a source for the external ground ones for 45 cents each instead of
1.60$ but u have to buy 1500. hit me off list
On Aug 18, 2015 10:59 AM, "That One Guy /sarcasm" <thatoneguyst...@gmail.com>
wrote:

> We pull back the foil on the apex cable over the sheath and make about 8
> wraps of the drain around it then slide it into the connector. For tying to
> a surge suppressor I was having them leave an 8 inch tail of the drain also
> to tie to the ground, but it was too much work
>
> On Tue, Aug 18, 2015 at 10:02 AM, Christopher Gray <
> cg...@graytechsoftware.com> wrote:
>
>> I'm going to try some Platinum Tools EZ connectors with their Pro/HD tool.
>>
>> When doing shielded wire for CPE and AP installations, is there a
>> preference for using internal or external ground connectors?
>>
>> Thanks - Chris
>>
>
>
>
> --
> If you only see yourself as part of the team but you don't see your team
> as part of yourself you have already failed as part of the team.
>

Reply via email to