If they have their own shed, and their own 25G on the property, they have some sort of extraordinary arrangement with AT already. They should not get you involved in what they want to "enhance", they should deal directly with AT.

bp
<part15sbs{at}gmail{dot}com>

On 7/6/2016 9:55 AM, That One Guy /sarcasm wrote:
We have a customer with equipment on an American Tower property. They have their own shed on the property with a 20' 25 g tower attached. They have us and a second WISP on their 25g, but our service requires another 10-30 feet depending on how much better they want the service

They want us to do the tower. I told the bosses absolutely not without some sort of build permit directly from American Tower.

Am I being a dick about this?

--