So a site, with 450-750 watt consumption. 6 to 24 to 48 hour battery
runtime, an option for a backup power source, solar, or turbine (small
turbine).

If the base requirement were a 48 volt plant, Secondary 24 volt (50w).
Normally AC source (unless magic sauce made wind or solar a better primary)
what specific gear would you drop for the 6 24 48 request if the limiting
space factor for power controllers or conditioners were 36hx36wx10d

Reply via email to