I would like to do a pier and pad type foundation for loose rocky soil. Possibly slate or shale at 6' depth.
I have a contractor that would clear a 100x100 lot and do the foundation for around 17k. Is this out of the park or
is this reasonable? --
I would like to do a pier and pad type foundation for loose rocky soil. Possibly slate or shale at 6' depth.
I have a contractor that would clear a 100x100 lot and do the foundation for around 17k. Is this out of the park or
is this reasonable? --