On Nov 7, 2012, at 2:37 PM, Dave Brondsema wrote:

> On 11/7/12 9:49 AM, Rich Bowen wrote:
>> Do we have all of the stuff we need from Infra? I seem to have lost the 
>> thread
>> of that conversation somewhere. We have a sandbox set up, right? Do we 
>> actually
>> have Allura running on it yet? What's the timeline for moving the Allura 
>> project
>> itself to be hosted on that Allura instance on the sandbox?
> 
> Pretty much.  https://issues.apache.org/jira/browse/INFRA-5039 set up the VM 
> and
> you and I have access.  We can get more people on there if desired.  All I've
> done is log in and look around.  We haven't installed Allura or any of its 
> deps
> yet.  So that is step 1.  After that, we'll have to figure out how to do auth
> (e.g. apache ldap or more open), how to connect to the apache git repo, and 
> most
> importantly how to move tickets etc over there (or to do a fresh start).
> 
> https://issues.apache.org/jira/browse/INFRA-5064 is for the Bloodhound VM to
> read from SVN, and is similar to our need for the Allura VM to read the git
> repo.  Not urgent though, since we don't have the Allura VM configured at all 
> yet.
> 
> 

Ok, thanks for the update. Not trying to rush anyone, just trying to get a feel 
for where we are in the process. Speaking of which, we should probably start 
making notes of stuff like this for next month's report.

-- 
Rich Bowen
[email protected] :: @rbowen
[email protected]






Reply via email to