Dear ALTO WG,



Below is my review for the performance metrics draft.




The document is well written and easy to follow. The specifications are also 
well-organized. I do not see major problems with the technical contents. 
However, there are a few typos and inconsistent usage of terms, as listed below.




Best,

Kai




======================================================================
Page 5: para 1:

rough -> roughly, max -> maximum

Page 6, sec 2.1

remove "and" before sla

latency typically do -> does

"SHOULD NOT" -> "MUST NOT", "can be placed" -> "must be placed"

Page 7, para 1:

a "sla" -> an "sla"

after figure 1, para 1:

"estimation -> "estimation"

Page 8,

with letter p -> with letter "p"

Page 15, example:

delay-var -> delay-variation

Page 28:

ALTO Server and Client -> ALTO server and client

Page 29:

"Since he ..." -> The paragraph is repeated and should be removed

==========================================================
_______________________________________________
alto mailing list
alto@ietf.org
https://www.ietf.org/mailman/listinfo/alto

Reply via email to