On Fri, 19 Jul 2002, Ulrik Sandberg wrote:
> Estimate Time (hrs:min) 1:25 > Run Time (hrs:min) 4:02 > Dump Time (hrs:min) 3:07 2:38 0:30 > Tape Time (hrs:min) 0:43 0:42 0:02 > > Does this mean: > > a) Total run time (estimate, dump and tape): 4:02 > > b) Total run time (estimate, dump and tape): 5:27 (4:02 + 1:25) Total run time is 4:02, as stated. The numbers don't add up because there is parallelism to be had from dumping simultaneous dumps to holding disk, plus there can be another dump simultaneously being spooled to from holding disk to tape. -Mitch