I noticed this problem after upgrading to 2.6.0 from 2.5.something.
All of a sudden it wouldn't complete a backup run and I was getting
messages from cron about the planner segfaulting. I culled some items
from my disklist, and all of a sudden it starting working again. After
a little experimenting, I've come to the conclusion that it's
happening whenever a backup estimate generates a backup size that's
bigger than the current tape size. The debug logs don't help, they
just end after closing a connection for an estimate. I do not
currently have tape spanning enabled, although it will probably be
something to try soon.
Anyone else seen this or have a fix? I havn't had a chance to look
into the source yet, figured I'd ask here before I started poking
around at something I wasn't familiar with :)
Thanks!
-Darrell
- amanda 2.6.0 planner segfaulting when the estimate fo... Telsin
-