Dear List,
I am still waiting for your help here

I have done some analysis need to check if this is ok.

Note : I need to install all the ITSM suites(service desk, Change),CMDB,Asset 
Management and Discovery Tool
The detail specifications of servers are as follows:


Hardware Details




Application Server


Database(2 server in cluster mode)


Webserver(Midtier)


Dell Sever


Dell Sever


Dell Sever


8 GB Ram


8 GB Ram


8 GB Ram


75 X 3 HDD


145 X 3 HDD


145 X 6 HDD


1 U servers


1U server


2U server


Raid 0


Raid 5


Raid 0/Raid 5


Dual 3 GHz process


Dual 3 GHz processor



Dual 3 GHz processor


Windows 2003 enterprise edition


Windows 2003 enterprise edition


Windows 2003 enterprise edition




Software requirement are as follows:

 *   Oracle 10G
 *   Crystal Report 11i
 *   ARS Server 7.5
 *   ITSM 7.6
 *   SLM 7.6
 *   CMDB 7.5
 *   Discovery tool

Regards
Rajesh

________________________________
From: Nair, Rajesh IN BOM SISL
Sent: Wednesday, June 23, 2010 10:10 AM
To: 'arslist@ARSLIST.ORG'
Subject: RE: Migration of 6.3 to 7.5

Sorry List for missing that part and thanks Joe for point that out

Our Prod and Database recide on two different server. both of same conf.
Dual processor with 4 GB RAM.. windows 2003 enterprise.

Prod: Remedy AR system 6.3 patch 23 and ITSM 5.5(HPD,CHG,Approval 
engine,Asset,SLA)
         Telalert software is being used for sending SMS.
         Prod server is integrated with AD.

Database :  Same conf as that of prod
                    oracle 9! with database size of Appox 26 GB

We have two different Miditier server V6.3 patch 23
one is used via intranet and another through Internet.

On both the Midtier server Crystal Report Server is installed.

Dev and Test Server : on this application and database recides on the same 
server along Midtier


Hope this information is sufficient

Regards
Rajesh


________________________________
From: Action Request System discussion list(ARSList) 
[mailto:arsl...@arslist.org] On Behalf Of Joe D'Souza
Sent: Tuesday, June 22, 2010 10:27 PM
To: arslist@ARSLIST.ORG
Subject: Re: Migration of 6.3 to 7.5

**
Rajesh,

A little more information about your current architecture might go a long way 
in helping people help you. Apart from your current application and database 
version and your desired application version after you upgrade, we know nothing 
about your current architecture..

Joe
-----Original Message-----
From: Action Request System discussion list(ARSList) 
[mailto:arsl...@arslist.org]on Behalf Of Nair, Rajesh IN BOM SISL
Sent: Tuesday, June 22, 2010 9:45 AM
To: arslist@ARSLIST.ORG
Subject: Migration of 6.3 to 7.5

**
Dear List,
We are in approval stage of migrating our existing system(ARS 6.3 ITSM 5.5 
oracle 9i) to a higher version probably 7.5
Can any let me know the steps which I need to take in consideration while 
migration and the Hardware configuration which can be best suited for this.

Or if some have a documentation which mentions the steps would also be 
beneficial

Regards
Rajesh
_attend WWRUG10 www.wwrug.com ARSlist: "Where the Answers Are"_
________________________________
Important notice: This e-mail and any attachment there to contains corporate 
proprietary information. If you have received it by mistake, please notify us 
immediately by reply e-mail and delete this e-mail and its attachments from 
your system.
Thank You.

_______________________________________________________________________________
UNSUBSCRIBE or access ARSlist Archives at www.arslist.org
attend wwrug10 www.wwrug.com ARSlist: "Where the Answers Are"

Reply via email to