When I used it I did not make any new indexes and I was able to move, on a good 
network, over 100K records per hour.





-----Original Message-----
From: Guillaume Rheault <guilla...@dcshq.com>
To: arslist <arslist@ARSLIST.ORG>
Sent: Mon, Jan 31, 2011 3:57 pm
Subject: Delta Data Migration tool (was Long running ITSM 7.6 upgrade)


** 
Hi David,

Will the Create Date and Modified Date(field IDs 3 and 6) need to be indexed in 
all the forms in the source system, so the delta data migration tool can 
quickly fetch the entries created or updated from a specific timestamp, to 
migatre the delta data into the new production system? 

Guillaume


From: Action Request System discussion list(ARSList) [arslist@ARSLIST.ORG] on 
behalf of Easter, David [david_eas...@bmc.com]
Sent: Sunday, January 30, 2011 11:50 AM
To: arslist@ARSLIST.ORG
Subject: Re: Long running ITSM 7.6 upgrade




Two recent capabilities are intended to assist with these kind of situations.
 
1.       The ITSM Preconfigured Suite Stack Installer.  The Suite Stack 
Installer (SSI) enables a fresh install of the entire ITSM Suite to be 
installed in an hour or two.  All of the applications and configurations are 
pre-loaded in a DB image provided by BMC – so the installer need only lay down 
the binaries and copy the DB image into an empty DB instance provided by you.  
Time has been reduced from up to 60 hours down to 1-2 hours for a fresh 
install.  While the SSI cannot be used for upgrades, it is good for creating a 
staging, development or POC system.
2.       Delta Data Migration.  The ITSM Suite 7.6.04 includes utilities that 
enable you to migrate data from your production environment to a 
staging/development server until you are ready to switch over from development 
to production.  Basically, you’ll create a parallel system in 
staging/development that will eventually become your production server.  When 
your maintenance window arrives, you can bring down both systems, transfer the 
last bit of user data (which should be only a couple of hours or, at most days) 
and then bring up the staging server as your new production server.  Downtime 
has been reduced to 4 hours or less using this methodology.
 
-David J. Easter
Manager of Product Management, Remedy Platform
BMC Software, Inc.
 
The opinions, statements, and/or suggested courses of action expressed in this 
E-mail do not necessarily reflect those of BMC Software, Inc.  My voluntary 
participation in this forum is not intended to convey a role as a spokesperson, 
liaison or public relations representative for BMC Software, Inc.



_attend WWRUG11 www.wwrug.com ARSlist: "Where the Answers Are"_ 

_______________________________________________________________________________
UNSUBSCRIBE or access ARSlist Archives at www.arslist.org
attend wwrug11 www.wwrug.com ARSList: "Where the Answers Are"

Reply via email to