I realize that some folks consider this stuff minutia and not worthy of discussion. In reality the physical infrastucture of the City is significant. What is being done today will be there for decades.
Anyway, recall that I reported the elimination of 15 of sidewalk width on Fifth Ave. I looked at the engineering drawings and that will be from Ocean Ave west to the end of the Salvation Army property line. The sidewlk will only be 10 ft wide for that entire stretch. Work has started on Sunset Ave by the BCH. The "island" at the entrance to the hotel is being eliminated along with the parking it provided. Parking is being reduced from 45 spaces to 34 spaces between Kingsley and Ocean. Werner Yahoo! Groups Links <*> To visit your group on the web, go to: http://groups.yahoo.com/group/AsburyPark/ <*> Your email settings: Individual Email | Traditional <*> To change settings online go to: http://groups.yahoo.com/group/AsburyPark/join (Yahoo! ID required) <*> To change settings via email: mailto:[EMAIL PROTECTED] mailto:[EMAIL PROTECTED] <*> To unsubscribe from this group, send an email to: [EMAIL PROTECTED] <*> Your use of Yahoo! Groups is subject to: http://docs.yahoo.com/info/terms/