Process change to scheduled Schedule::Cron from Perl (RebuildSchedule) ASSP 2.0.0 (5.19)
Is this normal after about a minute the process changes to: Real memory: 1.48 GB total / 744.51 MB free Swap space: 1 GB total / 1010.03 MB free ID Owner Size Command 25108 root 418292 kB Schedule::Cron MainLoop - next: Mon Sep 8 07:31:00 2008 25046 root 334476 kB Schedule::Cron MainLoop - next: Mon Sep 8 07:31:00 2008 >From a running assp.pl and an assp_exchange.pl once this happens I am no longer able to stop, start, or restart using (service assp.pl restart) and it never returns to the normal of the Perl processes I left it for two days Mail seem to be still flowing. Daniel Du Vall ------------------------------------------------------------------------- This SF.Net email is sponsored by the Moblin Your Move Developer's challenge Build the coolest Linux based applications with Moblin SDK & win great prizes Grand prize is a trip for two to an Open Source event anywhere in the world http://moblin-contest.org/redirect.php?banner_id=100&url=/ _______________________________________________ Assp-test mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/assp-test
