Process change to scheduled Schedule::Cron from Perl (RebuildSchedule)
ASSP 2.0.0 (5.19)

Is this normal after about a minute the process changes to:

Real memory: 1.48 GB total / 744.51 MB free   Swap space: 1 GB total /
1010.03 MB free

ID      Owner   Size    Command
25108   root    418292 kB       Schedule::Cron MainLoop - next: Mon Sep
8 07:31:00 2008
25046   root    334476 kB       Schedule::Cron MainLoop - next: Mon Sep
8 07:31:00 2008

>From a running assp.pl and an assp_exchange.pl once this happens I am no
longer able to stop, start, or restart using (service assp.pl restart)
and it never returns to the normal of the Perl processes I left it for
two days

Mail seem to be still flowing.

Daniel Du Vall

-------------------------------------------------------------------------
This SF.Net email is sponsored by the Moblin Your Move Developer's challenge
Build the coolest Linux based applications with Moblin SDK & win great prizes
Grand prize is a trip for two to an Open Source event anywhere in the world
http://moblin-contest.org/redirect.php?banner_id=100&url=/
_______________________________________________
Assp-test mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/assp-test

Reply via email to