It looks like release-0.8.1 is 2 commits ahead of master. I've done this in the past by doing 'git push --tags' without 'git push'. The tag and its commits go upstream, but the branch isn't moved.

Matt
--
Matthew Booth, RHCA, RHCSS
Red Hat Engineering, Virtualisation Team

GPG ID:  D33C3490
GPG FPR: 3733 612D 2D05 5458 8A8A 1600 3441 EA19 D33C 3490

_______________________________________________
augeas-devel mailing list
[email protected]
https://www.redhat.com/mailman/listinfo/augeas-devel

Reply via email to