Gotcha. I was hoping at least the two people with open tickets might but ah well. Thanks On Feb 21, 2012 6:04 PM, "David Lutterkort" <[email protected]> wrote:
> On Tue, 2012-02-21 at 09:29 -0600, Greg Swift wrote: > > So despite lack of karma, the build system allows this to be pushed to > > stable after 7 days, and so it has been pushed by me as of 30+ days. > > Yeah, that's the normal flow of things in bodhi; I rarely get enough > karma to push before the testing period is up. But I try to push as soon > after it is over as possible. > > David > > >
_______________________________________________ augeas-devel mailing list [email protected] https://www.redhat.com/mailman/listinfo/augeas-devel
