Here is the entire scheduled maintenance windows for all the halls we occupy.

DataHall 2
A Feed - Tuesday 8th August 2017 07:00 UTC +10 until 16:00 UTC +10.
B Feed - Tuesday 15th August 2017 07:00 UTC +10 until 16:00 UTC +10.

DataHall 3
A Feed - Tuesday 15th August 2017 07:00 UTC +10 until 16:00 UTC +10
B Feed - Monday 14th August 2017 07:00 UTC +10 until 16:00 UTC +10

DataHall 4
B Feed - Tuesday 15th August 2017 07:00 UTC +10 until 16:00 UTC +10.


·         So looks like no power on 3 data halls B feeds on the same day.

·         Data Hall 2 was scheduled for A rail on the 8th of August but has 
been re-scheduled with no new date of works.

·         Data Hall 3 was scheduled for A rail on the

Problem is that I have 3x separate dates on 3 separate e-mails for Data Hall 3 
and I have requested a revised clarification
Just now on the above as there has already been re-schedules for Data Hall 2 
and 3.

This feels like it’s going sideways and it has not even started.

Regards
Shaun


From: AusNOG [mailto:ausnog-boun...@lists.ausnog.net] On Behalf Of Murat Sener
Sent: Wednesday, 9 August 2017 3:20 PM
To: Matthew VK3EVL <hit...@itglowz.com>; ausnog@lists.ausnog.net
Subject: Re: [AusNOG] NextDC Melbourne - Scheduled Power Maintenance - 15th 
August

We have been told only Feed B in Data hall 2 will be effected as per original 
schedule and Feed A is yet to be rescheduled.



[cid:image001.png@01D31125.F3826EB0]

Murat Sener     Datacentre Manager

PREMIER Technology Solutions
P. 1300 76 76 48    F. 1300 76 76 49    M. 0450 604 350


How am I doing? Let us know!
SIMPLY CLICK ON A FACE TO GIVE FEEDBACK

GREAT

AVERAGE

BAD

[cid:image002.png@01D31125.F3826EB0]<https://www.crewhu.com/survey.html?crewHuID=qm0Hxbzstp&employeeID=rLeIz2SkIa&type=signat&rating=5>

[cid:image003.png@01D31125.F3826EB0]<https://www.crewhu.com/survey.html?crewHuID=qm0Hxbzstp&employeeID=rLeIz2SkIa&type=signat&rating=0>

[cid:image004.png@01D31125.F3826EB0]<https://www.crewhu.com/survey.html?crewHuID=qm0Hxbzstp&employeeID=rLeIz2SkIa&type=signat&rating=-5>



From: AusNOG [mailto:ausnog-boun...@lists.ausnog.net] On Behalf Of Matthew 
VK3EVL
Sent: Wednesday, 9 August 2017 3:13 PM
To: ausnog@lists.ausnog.net<mailto:ausnog@lists.ausnog.net>
Subject: Re: [AusNOG] NextDC Melbourne - Scheduled Power Maintenance - 15th 
August


What about both feeds happening on the same day at the same time?

On 9/08/2017 2:55 PM, Shaun McGuane wrote:
HI Damien,

My apologies that’s correct – but isn’t anyone concerned about the works being 
completed during business hours?
What about increased loading of the active rail once one of them is switched 
off for these works?

Regards
Shaun


From: Damien Gardner Jnr [mailto:rend...@rendrag.net]
Sent: Wednesday, 9 August 2017 2:39 PM
To: <ausnog@lists.ausnog.net><mailto:ausnog@lists.ausnog.net> 
<ausnog@lists.ausnog.net><mailto:ausnog@lists.ausnog.net>; Shaun McGuane 
<sh...@rackcentral.com><mailto:sh...@rackcentral.com>
Subject: Re: [AusNOG] NextDC Melbourne - Scheduled Power Maintenance - 15th 
August

It says 7am -> 4pm in what you quoted? (UTC+10 is AEST)

On Wed, 9 Aug 2017 at 2:36 pm, Shaun McGuane 
<sh...@rackcentral.com<mailto:sh...@rackcentral.com>> wrote:
HI Noggers,

Has anyone seen this scheduled maintenance notification happening next week?
They maybe upgrading feeds or boards throughout the datacentre – has everyone 
seen this notification of works?
It appears to be happening starting 5PM through to 2AM AEST for all Datahalls 
on the same date.


WHAT:
NEXTDC M1 Melbourne data centre, with the assistance of specialist contractors, 
will conduct offline preventative electrical maintenance work on high-voltage 
and low-voltage main isolators. This will affect A and B feeds to the racks in 
Data Hall 2/3/4 on the 15th of August.

WHEN:
A Feed - Tuesday 15th August 2017 07:00 UTC +10 until 16:00 UTC +10.
B Feed - Tuesday 15th August 2017 07:00 UTC +10 until 16:00 UTC +10.

HOW AM I AFFECTED?
Due to the nature of the work a single feed will be removed as per the dates 
and times above. We recommend that customers balance the power between both 
power rails to minimise impact during this period. If you have single feed 
devices we recommend you:

Regards
Shaun



_______________________________________________
AusNOG mailing list
AusNOG@lists.ausnog.net<mailto:AusNOG@lists.ausnog.net>
http://lists.ausnog.net/mailman/listinfo/ausnog
--

Damien Gardner Jnr
VK2TDG. Dip EE. GradIEAust
rend...@rendrag.net<mailto:rend...@rendrag.net> -  http://www.rendrag.net/
--
We rode on the winds of the rising storm,
 We ran to the sounds of thunder.
We danced among the lightning bolts,
 and tore the world asunder



_______________________________________________

AusNOG mailing list

AusNOG@lists.ausnog.net<mailto:AusNOG@lists.ausnog.net>

http://lists.ausnog.net/mailman/listinfo/ausnog


MESSAGE PROTECTED BY PREMIER TECHNOLOGY 
SOLUTIONS<http://www.premiertech.com.au> - POWERED BY 
MAILGUARD<http://www.mailguard.com.au/mg>.
Report this message as 
spam<https://console.mailguard.com.au/ras/1RqQHQIE5J/6DWUZjiMDnlts7JYyCLNB3/0>


MESSAGE PROTECTED BY PREMIER TECHNOLOGY 
SOLUTIONS<http://www.premiertech.com.au> - POWERED BY 
MAILGUARD<http://www.mailguard.com.au/mg>.

_______________________________________________
AusNOG mailing list
AusNOG@lists.ausnog.net
http://lists.ausnog.net/mailman/listinfo/ausnog

Reply via email to