On a daily basses
and good luck getting anything back. It's there property. Move on and welcome to the NBN.

Oh and my dry humor aside it's helpful to have a check list of things to do before scheduling staff to attend site. We always contacts the building manager and provide insurance make an appointment etc.  Just showing up is bound to get them offside from the start.  This is their castle treating them like the king helps.

Matt

On 14/5/19 1:35 pm, Alex Moorhouse wrote:
So I arranged for an MDF tech to do some jumpering after the NBN FTTB tech completed their side. Should have been a 5 minute job, but the building manager refused entry to our contracted tech and said we had to use their preferred contractor. Now I am out of pocket for the first visit and need to pay their contractor to visit again, not only wasting money but also time and customer frustration.

Has anyone come across this before? I believe I should be able to invoice the body corp for the first visit as I doubt it is legal for them to refuse entry to the MDF. Anyone have some legal codes/links I can attach to my email to them?

Thanks

_______________________________________________
AusNOG mailing list
AusNOG@lists.ausnog.net
http://lists.ausnog.net/mailman/listinfo/ausnog


--
/* Matt Perkins
        Direct 1300 137 379        Spectrum Networks Ptd. Ltd.
        Office 1300 133 299        m...@spectrum.com.au
                                   Level 6, 350 George Street Sydney 2000
        Spectrum Networks is a member of the Communications Alliance & TIO
*/

_______________________________________________
AusNOG mailing list
AusNOG@lists.ausnog.net
http://lists.ausnog.net/mailman/listinfo/ausnog

Reply via email to