Hi Gokhan.
 
In which work center is default you wanna do your operations?it is in automated or it is in manual?
If it is in automated, do you want to automatically systems move your load to the manual? or you wait till the automated machine is full first and when the manual is empty then you want the systems to alter the load?
 
I think you can do it through work center task group, in which the main work center is automated machine (the default work center) and it will be linked to manual wc so that if the automated wc is full while the manual wc is empty then the additional load can be put to the manual wc.
 
let me know if it can be done
 
 
Fajar Hidayat
Axapta Solutions Services Dept
 


From: Gokhan Can [mailto:[EMAIL PROTECTED]
Sent: Thursday, November 04, 2004 8:55 PM
To: [EMAIL PROTECTED]
Subject: Mutliple Workcenters with same operation

Hi all;
 
I have a problem about work centers and operations.
 
I usually do an operation with one work center but If another work center is empty I can divide my
operation into two parallel operations in one route .
 
But in axapta it does not let me to do this
 
as an example I can make holes on a plate by automated machine but if I have my manually machine  empty I can make some of holes by using manually machine.
 
10   primary           operation 1    workctr1    0
20   secondary       operation 2    workctr2    0
 
I get an error right here
 
Has anybody noticed this kind of problem?
 
 
 


Sharing the knowledge on Axapta.