Hi Gokhan.
In which work center is default you wanna do your
operations?it is in automated or it is in manual?
If it is in automated, do you want to automatically systems
move your load to the manual? or you wait till the automated machine is full
first and when the manual is empty then you want the systems to alter the
load?
I think you can do it through work center task group, in
which the main work center is automated machine (the default work center) and it
will be linked to manual wc so that if the automated wc is full while the manual
wc is empty then the additional load can be put to the manual
wc.
let me know if it can be done
Fajar Hidayat
Axapta Solutions Services Dept From: Gokhan Can [mailto:[EMAIL PROTECTED] Sent: Thursday, November 04, 2004 8:55 PM To: [EMAIL PROTECTED] Subject: Mutliple Workcenters with same operation Hi all;
I have a problem about work centers and operations.
I usually do an operation with one work center but If another work
center is empty I can divide my
operation into two parallel operations in one route .
But in axapta it does not let me to do this
as an example I can make holes on a plate by automated machine
but if I have my manually machine empty I can make some of holes by
using manually machine. 10 primary
operation
1 workctr1 0
20 secondary
operation 2 workctr2 0
I get an error right here
Has anybody noticed this kind of problem?
Sharing the knowledge on Axapta.