Dear all;

    I need help for production in Axapta 3.0.
    Thanks!

1.      A production planner has released a production order and 
wants to start the order for the total quantity. If he wants to 
automatically generate a complete picking list, where is it possible 
to correct material consumption and pick items from inventory at a 
later date? What are the proper setup actions to take?
A.      Start the production, complete the list journal, and post 
the picking list now
B.      Start the production, specify automatic BOM consumption 
¡®Always¡¯
C.      Start the production, specify automatic BOM consumption 
¡®Item dependent¡¯, and physical reduction
D.      Start the production, specify automatic BOM consumption 
¡®Never¡¯, and pick negative


2.      A company purchases and stores steel tube in pieces and 
consumes them in meters in the BOM. How is the setup performed in 
order to control the BOM consumption?
A. The unit chosen on the BOM line must be the stock unit
B. The unit chosen on the BOM line must be the purchase unit
C. The unit chosen on the BOM line could be any unit
D. The unit chosen on the BOM line must have a conversion factor 
defined


3.      Which of the following are possible when working with 
Master planning in Navision Axapta? (Select three)
A. To force Navision Axapta to use a non-active BOM version, when 
firming planned orders.
B. To lock planned orders for changes when running the master 
scheduling , by using time fences.
C. To choose any production status when firming planned production 
orders.
D. To choose the number of days for scheduling the capacity
E. To get Navision Axapta to choose a different vendor than the 
preferred if delivery time cannot be met.


4.      The term ¡°Critical on-hand inventory¡± in Navision Axapta 
reflects:
A. Items that have been stopped in the items table
B. Inventory transactions with the status ¡°Ordered¡± with a 
confirmed date later than the estimated date
C. Items for a production which are NOT on hand
D. Items for a production order where the consumed quantity has 
exceeded the estimated quantity


5.      What will occur if the check box ¡°End job¡± is selected 
when reporting a production order as finished?
A. The inventory transactions will be adjusted according to the 
quantity reported as finished on the production order.
B. Further posting of time consumption will NOT be possible.
C. Further posting of material consumption will NOT be possible.
D. Using the ¡°Reset status¡± on the production order will NOT be 
possible


6.      What is NOT a benefit resulting from the use of marking?
A.      To ensure that the right cost is used for the specific 
material issue
B.      To ensure the due date is correct
C.      The Item reference is updated when possible
D.      Master planning uses the marking when making the coverage 
calculation


7.      When making a correction (changing an Item NO.) in a BOM on 
a started production order, it is necessary for a production planner 
to delete the material consumption form one of the BOM lines. 
Material consumption has been reported and posted on the production 
order. Which of the following actions would be the best to take next?
A.      Set the status back to ¡®Created¡¯
B.      Issue the additional material consumptions
C.      Set the status back to ¡®Cost estimated¡¯
D.      Reschedule the production order
E.      Create a new production picking list journal and create two 
lines ¨C one to decrease, and the other to enter consumption on the 
new item


8.      When manufacturing prototypes, it is NOT desirable to post 
ledger transactions to separate accounts created specifically for 
prototype accounting. However if it is required to be able to keep 
track of all prototype-related transactions. Which of the following 
is the best practice to use?
A.      Keep a log of used voucher number in the prototypes
B.      Create an item group for prototype items, setup cost 
categories for work centres, and specify posting according to ¡®Item 
+ Category¡¯ for the production orders
C.      Create production groups for the prototype production orders
D.      Create special journals for the posting of prototype 
productions
E.      Create separate ledger dimensions that can be used every 
time postings are made related to prototype production orders.


9.      After running a Master schedule, there is a planned 
production order but no planned purchase orders for the required BOM 
lines. Which of the following CANNOT be the cause of this?
A.      The Explosion time fence is too short
B.      The Coverage codes for the BOM lines are set to ¡°Manual¡±
C.      The ¡®Stop explosion¡¯ check box for the BOM is selected
D.      The Freeze time fence is too long


10.     If sub-contracting has been included in a route and the 
vendor¡¯s capacity should NOT be scheduled, Which of the following is 
the best practice to use?
A.      Adjust the scheduling efficiency on the work centre or the 
work centre group
B.      Create a special vendor route group and leave all the 
fields unmarked in the capacity column
C.      Create variances on the calendar on the work centre or the 
work centre group
D.      Create a special vendor calendar with no working hours


11.     How can a fixed material consumption be handled as an 
addition to the variable material consumption on the BOM line?
A.      Select the material consumption on the BOM line to 
¡®constant¡¯ and the additional consumption
B.      Set a variable and constant material consumption directly 
on the BOM line
C.      Create a BOM line with constant scrap
D.      Set the scrap on the operation that consumes the material


12.     When making a BOM calculation, which qty field is used as 
series amount for BOM lines of type Item?
A.      Standard order quantity
B.      Quantity
C.      Min. quantity
D.      Max quantity
E.      Minimum





------------------------ Yahoo! Groups Sponsor --------------------~--> 
Has someone you know been affected by illness or disease?
Network for Good is THE place to support health awareness efforts!
http://us.click.yahoo.com/Rcy2bD/UOnJAA/cosFAA/kGEolB/TM
--------------------------------------------------------------------~-> 

Sharing the knowledge on Axapta. 
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/Axapta-Knowledge-Village/

<*> To unsubscribe from this group, send an email to:
    [EMAIL PROTECTED]

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/
 



Reply via email to