Hi, In that case you can have Item B as Phantom item and have route, the Phnatom Item's route gets copied into the main Item's route. But I am not sure when it gets copied whether the routing is just plainly appended to the Main item's route or it automatically sequences itself. In case the routing is sequenced then I thin you can have operation 10, 20, 30, 40 and just have your the Phantom item B's route in a sequence which just overlaps the main item's route sequence like 15, 25, 35 and usage of Overlap quantity will help in scheduling. This is just an idea you may have to test it out.
Hemant ----- Original Message ---- From: andreas gunawan <[EMAIL PROTECTED]> To: Axapta-Knowledge-Village@yahoogroups.com Sent: Sunday, November 19, 2006 5:34:13 AM Subject: Re: [Axapta-Knowledge-Village] Concurrent operations/work center in route Tks but it seems that i must made item B first from raw materials E, F and G. I thought I can mix the operation when I am currently mixing the C and D, in the same time, I mix item E, F and G with the routing inside routing when mix item C and D when producing item A. Is it possible ? Rgds, Hemant Kumthekar <[EMAIL PROTECTED] com> wrote: Hi, You can set the Line Type as "Item" for Item B when used in Item A. This will allow you to use the Item B from Stock and not from the Production order which is generated at the time of Estimation of Production for A. Hemant ----- Original Message ---- From: andreas gunawan <andreas2975@ yahoo.com> To: Axapta-Knowledge- [EMAIL PROTECTED] ups.com Sent: Saturday, November 18, 2006 12:55:08 AM Subject: [Axapta-Knowledge- Village] Concurrent operations/work center in route Dear All, I am confusing about creating concurrent route in AX. The situation as follows: Finish good = item A Bill of material item A contains = item B, item C and item D Bill of material item B contains = item E, F and G production processes steps are as follows: 0. 1. Mixing of C & D about 30 minutes 2. while mixing C and D, item B is made by heating 2 times. 1st heating is half qty of the solutions of E, F and G. After the boiling point is reached the 2nd heating begins by adding the remain qty of the items, mixing until the solutions homogenised. Steps two will require 30 minutes to make item B 3. The item B will introduce to the mixer of step 1 and then mixing for 20 minutes. 4. The output of step 3 will be feed to machine 3 for 45 minutees. 5. etc. my questions are how to set those situations in AX, whether it is possible to me not to set item type of item B to be BOM but just raw material ? what I want to have is that the system will not produce serialize schedulling in gantt but paralel schedulling, so I don't need to produce item B first then continue to produce finish good (final product). I appreciate for your answer. TIA. Rgds, ------------ --------- --------- --- Sponsored Link Mortgage rates near 39yr lows. $310,000 Mortgage for $999/mo - Calculate new house payment [Non-text portions of this message have been removed] ____________ _________ _________ _________ _________ _________ _ Sponsored Link Mortgage rates near 39yr lows. $420k for $1,399/mo. Calculate new payment! www.LowerMyBills. com/lre [Non-text portions of this message have been removed] ------------ --------- --------- --- Sponsored Link Degrees for working adults in as fast as 1 year. Bachelors, Masters, Associates. Top schools [Non-text portions of this message have been removed] ____________________________________________________________________________________ Sponsored Link $200,000 mortgage for $660/ mo - 30/15 yr fixed, reduce debt - http://yahoo.ratemarketplace.com [Non-text portions of this message have been removed]