Hi All, After clicking on the complete button on the BOMCalcTable form, then the BOMCalcTrans opens and here the display method for Total cost is calculated based on the Bom lines. Actually I need to display different value for those data which has no setup time selected. Or if i can get the linenumber when the firstrecord and check with the linenumber of the old one with new one, when i go to second record in BOMCalctrans and i can change the value. Can anyone help me how to proceed further.
Can anyone tell me how the number of lines in BOMCAlctrans table is increased and by what criteria it is increased for a BOM. regrds