Hi All!

How to assign raw material to individual operation which is required at the 
time of that particular operation.

EG:
    Z = X + Y
    X & Y are raw material. Z is finished product.
    Operation : 
           10: Drilling ( here only X is required)
           20: Assebmling (here Y will be introduced)

Could anyone help me in to assign raw material to individual operation which is 
required at the time of that particular operation.

Thanks in advance,
See5623


Reply via email to