Do you have
On 8/10/07, Marc Schiffbauer <[EMAIL PROTECTED]> wrote:
> Hi all,
>
> my director (2.0.3) does not run two "independent" jobs
> simultaneously.
>
> I have set "Maximum Concurrent Jobs = 10" in the Director{}
> ressource, but this seems to have no effect.
>
> The strange thing is that I only try to run two different jobs which
> write to two different storages at the same time, which should be no
> problem at all.
Are both jobs in the same pool?
John
-------------------------------------------------------------------------
This SF.net email is sponsored by: Splunk Inc.
Still grepping through log files to find problems? Stop.
Now Search log events and configuration files using AJAX and a browser.
Download your FREE copy of Splunk now >> http://get.splunk.com/
_______________________________________________
Bacula-devel mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/bacula-devel