On Sunday 29 March 2009 21:38:29 Arno Lehmann wrote:
> Hi,
>
> I'm currently testing 2.5.42 (svn as of Mar 24, I believe) and have
> the following set in the defaults for all jobs:
>
> Allow Duplicate Jobs = No
> Allow Mixed Priority = Yes # doesn't apply as of now...
> Max Run Sched Time = 3600 # 1 hour
> Max Run Time = 1800 # 1/2 hour
> Max Wait Time = 1200 # 20 min
>
> All jobs are run every 15 minutes with different levels.
You talk about scheduling problems, but show only a JobDefs. I don't see the
connection, and thus without a schedule resource and a Job resource, I cannot
confirm anything.
Kern
>
> DIR config excerpts:
>
> JobDefs {
> Name = "DefaultJob"
> Type = Backup
> Level = Incremental
> Client = gnom-fd
> FileSet = "Full Set"
> Schedule = "WeeklyCycle"
> Storage = File
> Messages = Standard
> Pool = Default
> Priority = 10
> Allow Duplicate Jobs = No
> Allow Mixed Priority = Yes
> Max Run Sched Time = 3600
> Max Run Time = 1800
> Max Wait Time = 1200
> }
>
> With these settings, the scheduler queue display is incorrect. See here:
> > *autom
> > Turn on or off? off
> > *time
> > 29-Mär-2009 21:29:03
> > *sta dir
> > demo-dir Version: 2.5.42-b2 (16 March 2009) i686-pc-linux-gnu suse 11.1
> > Daemon started 29-Mär009 21:28, 0 Jobs run since started.
>
> DIR freshly started to make sure I didn't mess up anything earlier...
>
> > Heap: heap=270,336 smbytes=64,080 max_bytes=64,633 bufs=356 max_bufs=358
> >
> > Scheduled Jobs:
> > Level Type Pri Scheduled Name Volume
> > =========================================================================
> >==========
>
> No jobs scheduled before the BackupCatalog, i.e. at 21:30, 21:45,
> 22:00, etc.?!
>
> > Full Backup 11 29-Mär009 23:10 BackupCatalog FIL0537
> > Migrate 10 29-Mär009 23:25 MigratePhoenix
> > Differential Backup 10 30-Mär009 00:00 Demo1 FIL0537
> > Differential Backup 10 30-Mär009 00:00 DemoWin FIL0258
> > Differential Backup 10 30-Mär009 00:00 Demo3 FIL0537
> > Differential Backup 10 30-Mär009 00:00 Demo2 FIL0537
> > Incremental Backup 10 30-Mär009 00:15 Demo1 FIL0537
> > Incremental Backup 10 30-Mär009 00:15 Demo2 FIL0537
> > Incremental Backup 10 30-Mär009 00:15 Demo3 FIL0537
> > Incremental Backup 10 30-Mär009 00:15 DemoWin FIL0258
> > Full Backup 10 30-Mär009 00:30 Demo1 FIL0537
> > Full Backup 10 30-Mär009 00:30 Demo2 FIL0537
> > Full Backup 10 30-Mär009 00:30 Demo3 FIL0537
> > Full Backup 10 30-Mär009 00:30 DemoWin FIL0258
> > Incremental Backup 10 30-Mär009 00:45 Demo1 FIL0537
> > Incremental Backup 10 30-Mär009 00:45 Demo2 FIL0537
> > Incremental Backup 10 30-Mär009 00:45 Demo3 FIL0537
> > Incremental Backup 10 30-Mär009 00:45 DemoWin FIL0258
> > Migrate 10 30-Mär009 05:23 MigratePhoenix
> > Migrate 10 30-Mär009 11:23 MigratePhoenix
> > Migrate 10 30-Mär009 17:23 MigratePhoenix
> > ====
> >
> > Running Jobs:
> > Console connected at 29-Mär009 21:28
> > Console connected at 29-Mär009 21:28
> > No Jobs running.
> > ====
> >
> > Terminated Jobs:
> > JobId Level Files Bytes Status Finished Name
> > ====================================================================
> > 2596 Incr 10 255.5 K OK 29-Mär009 21:20
> > DemoWin.2009-03-29_17 2595 Full 10 255.5 K OK
> > 29-Mär009 21:20 MigratePhoenix.2009-03-29_17 2659 Incr 0
> > 0 OK 29-Mär009 21:20 Demo3.2009-03-29_21 2658 Incr 0
> > 0 OK 29-Mär009 21:20 Demo2.2009-03-29_21 2656 Diff
> > 0 0 Error 29-Mär009 21:20 DemoWin.2009-03-29_21 2657 Incr
> > 64 2.447 K OK 29-Mär009 21:20 Demo1.2009-03-29_21 2660
> > Incr 0 0 OK 29-Mär009 21:21
> > DemoWin.2009-03-29_21 2600 Full 18 262.5 K OK
> > 29-Mär009 21:21 DemoWin.2009-03-29_17 2604 Incr 0 0
> > OK 29-Mär009 21:22 DemoWin.2009-03-29_17 2608 Diff 0
> > 0 OK 29-Mär009 21:22 DemoWin.2009-03-29_18
> >
> > ====
>
> Wait a bit...
>
> > *time
> > 29-Mär-2009 21:30:40
> > You have messages.
> > *sta dir
> > demo-dir Version: 2.5.42-b2 (16 March 2009) i686-pc-linux-gnu suse 11.1
> > Daemon started 29-Mär009 21:28, 1 Job run since started.
> > Heap: heap=389,120 smbytes=113,893 max_bytes=124,942 bufs=514
> > max_bufs=549
> >
> > Scheduled Jobs:
> > Level Type Pri Scheduled Name Volume
> > =========================================================================
> >==========
>
> Still nothing new scheduled.
>
> > Full Backup 11 29-Mär009 23:10 BackupCatalog FIL0537
> > Migrate 10 29-Mär009 23:25 MigratePhoenix
> > Differential Backup 10 30-Mär009 00:00 Demo1 FIL0537
> > Differential Backup 10 30-Mär009 00:00 DemoWin FIL0258
> > Differential Backup 10 30-Mär009 00:00 Demo3 FIL0537
> > Differential Backup 10 30-Mär009 00:00 Demo2 FIL0537
> > Incremental Backup 10 30-Mär009 00:15 Demo1 FIL0537
> > Incremental Backup 10 30-Mär009 00:15 Demo2 FIL0537
> > Incremental Backup 10 30-Mär009 00:15 Demo3 FIL0537
> > Incremental Backup 10 30-Mär009 00:15 DemoWin FIL0258
> > Full Backup 10 30-Mär009 00:30 Demo1 FIL0537
> > Full Backup 10 30-Mär009 00:30 Demo2 FIL0537
> > Full Backup 10 30-Mär009 00:30 Demo3 FIL0537
> > Full Backup 10 30-Mär009 00:30 DemoWin FIL0258
> > Incremental Backup 10 30-Mär009 00:45 Demo1 FIL0537
> > Incremental Backup 10 30-Mär009 00:45 Demo2 FIL0537
> > Incremental Backup 10 30-Mär009 00:45 Demo3 FIL0537
> > Incremental Backup 10 30-Mär009 00:45 DemoWin FIL0258
> > Migrate 10 30-Mär009 05:23 MigratePhoenix
> > Migrate 10 30-Mär009 11:23 MigratePhoenix
> > Migrate 10 30-Mär009 17:23 MigratePhoenix
> > ====
>
> But:
> > Running Jobs:
> > Console connected at 29-Mär009 21:28
> > Console connected at 29-Mär009 21:28
> > JobId Level Name Status
> > ======================================================================
> > 2662 Full Demo2.2009-03-29_21.30.00.05 is running
> > 2663 Full Demo3.2009-03-29_21.30.00.06 is running
> > 2664 Full DemoWin.2009-03-29_21.30.00.07 is waiting on Storage File
> > ====
> >
> > Terminated Jobs:
> > JobId Level Files Bytes Status Finished Name
> > ====================================================================
> > 2595 Full 10 255.5 K OK 29-Mär009 21:20
> > MigratePhoenix.2009-03-29_17 2659 Incr 0 0 OK
> > 29-Mär009 21:20 Demo3.2009-03-29_21 2658 Incr 0 0 OK
> > 29-Mär009 21:20 Demo2.2009-03-29_21 2656 Diff 0 0
> > Error 29-Mär009 21:20 DemoWin.2009-03-29_21 2657 Incr 64
> > 2.447 K OK 29-Mär009 21:20 Demo1.2009-03-29_21 2660 Incr
> > 0 0 OK 29-Mär009 21:21 DemoWin.2009-03-29_21 2600 Full
> > 18 262.5 K OK 29-Mär009 21:21 DemoWin.2009-03-29_17 2604
> > Incr 0 0 OK 29-Mär009 21:22
> > DemoWin.2009-03-29_17 2608 Diff 0 0 OK
> > 29-Mär009 21:22 DemoWin.2009-03-29_18 2661 Full 1,017 65.49 K
> > OK 29-Mär009 21:30 Demo1.2009-03-29_21
>
> And this one is already finished...
>
> And I did not start any jobs manually, by the way :-)
>
> So, for some reason, something breaks the scheduler display, but the
> scheduler itself works correctly.
>
> This might be related to the above mentioned settings as I did not
> observe this behaviour before I inserted that to the job defaults.
>
> Can anybody confirm this?
>
> Arno
>
> > ====
> > *quit
------------------------------------------------------------------------------
_______________________________________________
Bacula-devel mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/bacula-devel