Hi,

I've enabled "Rerun Failed Levels" on a job that does "VirtualFull".
But after VirtualFull fails, the Job is Rerun as normal Full. 

Same behaviour with "Reschedule On Error". A "VirtualFull" is rerun
als normal "Full".

Is that desired or a bug? Running Bacula 5.0.2

thx

____________________________________

Michael Patzer
Network and Security Engineer



------------------------------------------------------------------------------
ThinkGeek and WIRED's GeekDad team up for the Ultimate 
GeekDad Father's Day Giveaway. ONE MASSIVE PRIZE to the 
lucky parental unit.  See the prize list and enter to win: 
http://p.sf.net/sfu/thinkgeek-promo
_______________________________________________
Bacula-devel mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/bacula-devel

Reply via email to