http://www.bacula.org/5.2.x-manuals/en/main/main/Configuring_Director.html
The Job Resources
...
Incremental Max Run Time = time
The time specifies the maximum allowed time that an Incremental backup job
may run, counted from when the job starts, (not necessarily the same as when
the job was scheduled).
Differential Max Wait Time = time
The time specifies the maximum allowed time that a Differential backup job
may run, counted from when the job starts, (not necessarily the same as when
the job was scheduled).
Should that be "Differential Max Run Time"? That's what the description implies.
James
------------------------------------------------------------------------------
This SF email is sponsosred by:
Try Windows Azure free for 90 days Click Here
http://p.sf.net/sfu/sfd2d-msazure
_______________________________________________
Bacula-devel mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/bacula-devel