Major 43 is off the NDIC list today.  Nabors 337 looks like they are
moving onto the Van Hook next.  Where will Major 43 show up next?

On Oct 7, 7:47 am, Larry <[EMAIL PROTECTED]> wrote:
> If it only takes two days to drill the first segment, EOG may start
> subcontracting the rig to other drillers.
>
> Major 43 ostensibly could drill 15 holes per month and EOG's current
> fleet of 8 big rigs can only finish drilling, at best,  8 holes per
> month.
>
> For those of us who follow EOG's drilling program closely, all we now
> need to do is follow Major 43 from one location to the next as that
> will be the location for the next big rig.
>
> On Oct 7, 9:35 am, David <[EMAIL PROTECTED]> wrote:
>
>
>
> > Yes..digging around I found the exact same page and was about to post
> > it but you beat me to it LOL!
>
> > These rigs look pretty much like I thought..big truck-based outfits
> > like a workover rig drilling 2000-3000 ft or so.
> > Guys, take a look at all the interesting photos on the site Larry
> > flagged, above. If this works no doubt we will see a lot more of this
> > going on.
>
> > On Oct 6, 6:59 pm, ndmudpuppy <[EMAIL PROTECTED]> wrote:
>
> > > Here's a link to Majors drilling showing their different types of rigs
>
> > >http://www.majordrilling.com/catalogue.cfm
>
> > > On Oct 6, 4:24 pm, Larry <[EMAIL PROTECTED]> wrote:
>
> > > > Thanks David,
> > > > It would make sense to use an easily transportable rig to drill the 13
> > > > inch hole to below the water table level, case and cement the well,
> > > > and then move on. That would save a couple of days for the big rig to
> > > > the horizontal lateral.
>
> > > > On Oct 6, 5:28 pm, David <[EMAIL PROTECTED]> wrote:
>
> > > > > as I understand it Major 43 only drills the initial 2000-3000 of the
> > > > > well, and after that the main rig comes in..I THINK its set up to do
> > > > > this within the space of only a few days. So the active rig list may
> > > > > be correct.
>
> > > > > I am anxious to see a photo of Major 43..it may be on a big truck as
> > > > > it drills.
>
> > > > > Had I been in the territory, I would have been there studying this.
>
> > > > > EOG might be able to drill faster using two different rigs per
> > > > > well..this is a test.
> > > > > D
>
> > > > > On Oct 6, 1:14 pm, Larry <[EMAIL PROTECTED]> wrote:
>
> > > > > > The NDIC active rigs showed Major 43 spudding Burke 31 on October 3
> > > > > > and now they show it spudding Van Hook 5 today.
>
> > > > > > Anyone know where the rig is located?
>
> > > > > > MAJOR 43 EOG RESOURCES INC VAN HOOK 5-11H SESE 11-152N-91W MTL 17280
> > > > > > 10/5/2008 Undetermined
> > > > > > MAJOR 43 EOG RESOURCES INC BURKE 21-30H SWSE 30-155N-90W MTL 17409
> > > > > > 10/3/2008 Undetermined- Hide quoted text -
>
> > > > > - Show quoted text -- Hide quoted text -
>
> > > > - Show quoted text -- Hide quoted text -
>
> > > - Show quoted text -- Hide quoted text -
>
> > - Show quoted text -- Hide quoted text -
>
> - Show quoted text -
--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"Bakken Shale Discussion" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to [EMAIL PROTECTED]
For more options, visit this group at 
http://groups.google.com/group/bakken-shale-discussion?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to