A little birdy said: After September 30, 2008, all wells in the Alger-Bakken Pool shall be allowed to produce at a maximum efficient rate for a period of 60 days commencing on the first day oil is produced through well-head equipment into tanks from the ultimate producing interval after casing has been run; after that, oil production from such wells shall not exceed an average of 200 barrels per day for a period of 60 days; after that, oil production from such wells shall not exceed an average of 150 barrels per day for a period of 60 days, thereafter, oil production from such wells shall not exceed an average of 100 barrels of oil per day; if and when such wells are connected to a gas gathering and processing facility the foregoing restrictions shall be removed, and the wells shall be allowed to produce at a maximum efficient rate. The Director is authorized to issue an administrative order allowing unrestricted production at a maximum efficient rate for a period not to exceed 120 days, commencing on the first day oil is produced through well-head equipment into tanks from the ultimate producing interval after casing has been run, if the necessity therefor can be demonstrated to his satisfaction.
On Oct 23, 5:37 pm, go-devil <[EMAIL PROTECTED]> wrote: > Can anyone point me out where to find the Flaring Restrictions for > Alger Field in Mountrail or in general? --~--~---------~--~----~------------~-------~--~----~ You received this message because you are subscribed to the Google Groups "Bakken Shale Discussion" group. To post to this group, send email to [email protected] To unsubscribe from this group, send email to [EMAIL PROTECTED] For more options, visit this group at http://groups.google.com/group/bakken-shale-discussion?hl=en -~----------~----~----~----~------~----~------~--~---
