Unofficial results after 10/22/08 fracture indicate Veigel 1-9H at 528 bopd. The well is flowing a very large amount of gas for a Bakken well-1,000,000 cfg. Plans are in effect to remove all (2) wells from the gas line so as to get all of the 1-9H to market. Currently they are burning off part of it as the pipe cannot handle the quantity. At the very same time many of the wells in NW Killdeer will be permitted to drill an additional horizontal well in each spacing unit. Talk at the NDIC indicated there is an interest in locating the 2nd well as far away from the current well as possible. Likely because of the possibility of a 3rd well at a later date. --~--~---------~--~----~------------~-------~--~----~ You received this message because you are subscribed to the Google Groups "Bakken Shale Discussion" group. To post to this group, send email to [email protected] To unsubscribe from this group, send email to [EMAIL PROTECTED] For more options, visit this group at http://groups.google.com/group/bakken-shale-discussion?hl=en -~----------~----~----~----~------~----~------~--~---
