Hi,
according to the documentation about data spooling it should be possible to 
run several jobs in parallel, one writing directly to the tape drive while 
another job is filling the spooling area, despooling when the first job 
releases the drive.
When I set Maximum Concurrent Jobs = 1 in the device configuration, the 
spooling job reserves the tape drive and the direct jobs are waiting for 
the drive, instead writing to it. When I set Maximum Concurrent Job greater 
than 1, the direct jobs write intermixed to the tape. That's not how it's 
intended.

Are there any settings to achieve a time optimized use of tape drives with 
a mix of direct and spooling jobs? I couldn't elaborate this. In my opinion 
the spooling job shouldn't claim and block the tape drive before spooling 
ended.

Thank you for any input.

-- 
You received this message because you are subscribed to the Google Groups 
"bareos-users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to bareos-users+unsubscr...@googlegroups.com.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/bareos-users/81b3290c-c01c-4ef6-9168-e0c876bddcd4n%40googlegroups.com.

Reply via email to