Bang Aksan..Mf banget nih dah ngerepotin..sampe-sampe pegel pisan gitu...
biar saya review lagi...:-)

  ----- Original Message ----- 
  From: Aksan Kurdin 
  To: [email protected] 
  Sent: Monday, May 24, 2010 6:51 PM
  Subject: Re: [belajar-access] Re: Default value


    
  Dear P. Maulana,
  tolong review rumusan bapak ini, ada beberapa textbox yang tidak punya dasar 
perhitungan, padahal dia dipakai juga untuk proses yang lain.
  lainkali jika ingin di review bareng, beri nama textbox yang mewakili 
fieldnya pak, susah nge-trace-nya ... 
  pegel pisan ... :)


        Description Text Table Value Agency 
        DAILY MAINTENANCE TIME 121 T_DAILY_PRODUCTION_DETAIL SUM(DELAY)/60 
MAINT','SECTION','PC' 
        ELECTRICAL DOWNTIME 124 T_DAILY_PRODUCTION_DETAIL SUM(DELAY)/60 EL 
        HOLIDAY SHUTDOWN TIME 86 T_DAILY_PRODUCTION_DETAIL SUM(DELAY)/60 HD 
        MECHANICAL DOWNTIME 123 T_DAILY_PRODUCTION_DETAIL SUM(DELAY)/60 MK 
        OPERATION DOWNTIME 122 T_DAILY_PRODUCTION_DETAIL SUM(DELAY)/60 OP 
        PEAKHOUR SHUTDOWN 126 T_DAILY_PRODUCTION_DETAIL SUM(DELAY)/60 PK 
        PLANNED SHUTDOWN TIME 85 T_DAILY_PRODUCTION_DETAIL SUM(DELAY)/60 PS 
        UNCONTROLLABLE + MATERIAL + QC 125 T_DAILY_PRODUCTION_DETAIL 
SUM(DELAY)/60 UNC','MAT','QC' 
        GAS CONSUMPTION ON COIL 127 T_FUEL_CONSUMPTION SUM(GAS) / {COBBLE}   
        POWER CONSUMPTION 128 T_FUEL_CONSUMPTION SUM(POWER) / {COBBLE}   
        COBBLE 42 T_PROFILE_ROLLED SUM(COBBLES)*100/SUM(BILLETS_ROLLED)   
        PRODUCTION 40 T_PROFILE_ROLLED 
SUM(BILLETS_ROLLED)-SUM(COBBLES)-SUM(THROWN_OUT))*1.308   
        YIELD - BILLET/WIRE ROD 129 T_PROFILE_ROLLED {COBBLE} * 100 / 
SUM(BILLETS_ROLLED)*1.325   
        ACTUAL ROLLING TIME 89   {AVAILABLE ROLLING TIME} - {DAILY MAINTENANCE 
TIME} - {OPERATION DOWNTIME} - {MECHANICAL DOWNTIME} - {ELECTRICAL DOWNTIME} - 
{UNCONTROLLABLE + MATERIAL + QC}   
        ACTUAL ROLLING TIME - DAILY 81   {ACTUAL ROLLING TIME} / {AVAILABLE 
ROLLING DAYS}   
        AVAILABLE ROLLING DAYS 87   ({AVAILABLE ROLLING TIME} + {PEAKHOUR 
SHUTDOWN}) / 24   
        AVAILABLE ROLLING TIME 88   {CALENDAR TIME} - {PLANNED SHUTDOWN TIME} - 
{PEAKHOUR SHUTDOWN} - {HOLIDAY SHUTDOWN}   
        CALENDAR DAYS 83   ???   
        CALENDAR TIME 84   ???   
        HOLIDAYS 364   ???   
        ROLLING RATE 80   {PRODUCTION} / {ACTUAL ROLLING TIME}   
        UTILIZATION 353   {ACTUAL ROLLING TIME} * 100 / {AVAILABLE ROLLING 
TIME}   



  aksan kurdin




  On 5/24/2010 1:03 PM, Maulana wrote: 

      

    o y gimana nih kabarnya yg ini Bang. Aksan....
    sangat d harap" cemas... :-)

      ----- Original Message ----- 
      From: aksankurdin 
      To: [email protected] 
      Sent: Saturday, May 22, 2010 2:21 PM
      Subject: [belajar-access] Re: Default value


        
      ngga ada, saya create sendiri, ngira2 ....

      aksan kurdin

      --- In [email protected], "Maulana" <maulana_...@...> wrote:
      >
      > disana sudah di sertakan semua kalau ngga salah...Bang
      > 
      > 
      > ----- Original Message ----- 
      > From: Aksan Kurdin 
      > To: [email protected] 
      > Sent: Friday, May 21, 2010 5:49 PM
      > Subject: Re: [belajar-access] Default value
      > 
      > 
      > 
      > Nilai Agency di T_DAILY_PRODUCTION_DETAIL ada master kan ? sekalian di 
kopikan pak maulana.
      > 
      > aksan kurdin
      > 
      > 
      > On 5/20/2010 10:39 AM, Maulana wrote: 
      > 
      > 
      > 
      > Dear Bang Aksan, Haer
      > 
      > dilampiran disertakan form yg kmrin belum terselesaikan,
      > untuk itu ingin solusinya, trims atas bantuannya
      > 
      > salam
      >






  

Kirim email ke