The section in question is the westernmost 1 mile of Old Sauk Road,  
Fortunately it also has
the lowest traffic volume.  At prior urging, I believe the Town had already 
planned to pave the
section from Pioneer Road to Swoboda Road (1/2 mile) to a width of 28 feet 
because the
roadbed was already wide enough to do so.  Could somebody check on that?.

Here is a note I sent to Town Administrator back in April.

*********************************************************

David Shaw
Town of Middleton Administrator

David.

As you know I have been following with great interest the improvement of Old 
Sauk Road
from Pioneer Road to Timber Lane and the ensuing bicycling "escape route" 
issues.

I understand that the original concept was to pulverize the existing 20 to 
22-foot road and
overlay with a 28-foot pavement.  Then issues such as minor contamination of 
the existing
base course, substandard sight distance at a couple of hill crests and 
intersection needs
arose.

In good faith the consultant then proposed a reconstruction with improved sight 
lines and a
new pavement structure.  This alternative was at a greater cost.  Further I 
understand that
the consultant proposed another alternative with bike lanes (actually paved 
shoulders) at an
even greater cost.  I have heard that the Town Board balked at the latter 
proposal.  That is
probably understandable for a road that is still in transition as additional 
development occurs.

After reviewing all of the scenario's I suggest that you consider and move 
ahead with the
original pulverize and overlay proposal for a 28-foot pavement.
 
This is the most cost effective alternative for an area that is still evolving.
 
Any contamination would be encapsulated under the asphalt and seeded topsoil.  
This is
common practice on many roadway projects.  Even bicycle paths in old railroad 
corridors use
this best practice.
 
The sight distance issues appear to be minor especially for a 35 mph posted 
road. Ironically
when I was Planning Chief for the Southwest District of WisDOT I granted sight 
distance
exceptions when the Town reconstructed Airport.  Those sight distance were more 
severe
than any on Old Sauk Road.  Such exceptions are not required on a resurface.
 
If certain intersections need some geometric improvements, go ahead and make 
those spot
improvements.
 
Pavement mark the road with 10-foot motor vehicle lanes and 4-foot paved 
shoulders road. 
Ten-foot lanes will further "calm" the traffic, which to appears to want with 
the posted 35 mph
limit - very difficult to adhere to with wide motor vehicle lanes.  The 4-foot 
paved shoulders
would meet minimum requirements for bikes. (As a reference point - two lanes in 
each
direction on East Washington Avenue in Madison are 10 feet.)

With due respect to your consultant, please go with pulverize and overlay.  It 
best serves
everyone's needs at the lowest cost.

Please do not hesitate to give me a call if you or the Town Board have any 
questions of me.


Michael Rewey, P.E.

--------------------------------------------------
On 1 Dec 2010 at 8:56, Larry D. Nelson wrote:

This is unfortunate but not surprising. The cost of preparing plans and doing 
the
environmental work to federal/state standards probably represents one-half the 
cost of
the grant and those local costs are not eligible for funding according to the 
procedures of
our MPO (Metropolitan Planning Organization.) On the other hand, bike lanes on 
arterial
streets, including County Trunk Highways should be considered as elemental 
design.

From: [email protected] 
[mailto:[email protected]] On
Behalf Of Kevin Luecke
Sent: Tuesday, November 30, 2010 4:07 PM
To: [email protected]
Cc: Bike Fed Staff
Subject: [Bikies] Town of Middleton refusing TE Funds

Hello All.

It looks like rejecting state and federal funds for transportation projects is
unfortunately catching on in Wisconsin: today the Town of Middleton notified
WisDOT that they are refusing the Transportation Enhancement funds they were
awarded to add wide shoulders to Old Sauk Road.

You may recall that this has been an ongoing issue with the Town's planned
reconstruction of Old Sauk. The project is between Timber Lane and Swoboda Road.
The Town is planning on widening the road from 22' to 24', but stated that 
widening
to 28' to include wide shoulders/bike lanes was cost prohibitive. There is a 
Capital
Times article from early this year about the issue here:

http://host.madison.com/ct/news/local/govt_and_politics/article_b3533244-507e-
11df-bb09-001cc4c03286.html

Most people assumed the issue was resolved when the Town applied for a $235,880
grant ($294,850 total cost) to add the additional width. The Town was awarded 
its
full grant request even though many people felt that the Town should be 
carrying out
this project on its own without grant money.

Well, the Town decided that even after receiving the grant, they are not going 
to
construct the additional road width. According to the Town, they will have to 
push
back the start date from early spring in order to conduct environmental and
engineering studies for the project. They also state that because the grant is 
for a
fixed sum, it may not cover all their costs, especially if a delay increases 
costs (keep
in mind, the Town chose how much money to apply for). These concerns are
legitimate, but should have been figured out before applying for the money.

My personal feeling is that the Town never intended to do the project in the 
first
place, expected to have their grant request rejected, but wanted to look good in
applying for the money. Then when they didn't get the grant they could say 
"Well, we
tried." However, when the grant was awarded they had to scramble to come up with
reasons why they wouldn't be accepting nearly a quarter million dollars in 
funds.

I don't have any action for people to take at this time - it seems the Town is 
pretty set
in their decision. I just wanted to keep people posted on local bike funding and
facilities. Fortunately there are plenty of other communities who will be glad 
to use
the funds that the Town is refusing!

Kevin

--
Kevin Luecke
Lead Planner, Bicycle Federation of Wisconsin
www.bfw.org
608-251-4456