iOS is tagged.  I updated the VERSION and the change log.  Steve, you don't 
have the latest commit in the iOS change list below:  * Fixes CB-101 can't 
access media in documents://subDir

-becky

On Dec 12, 2011, at 11:12 PM, Jesse wrote:

> Windows Phone repo is tagged 1.3.0rc2
> 
> 
> On Mon, Dec 12, 2011 at 1:54 PM, Simon MacDonald
> <[email protected]>wrote:
> 
>> I just tagged Android to 1.3.0rc2 which is basically unchanged from
>> 1.3.0rc1. I'm going to send out my rough test plan either later today
>> or early tomorrow.
>> 
>> Simon Mac Donald
>> http://hi.im/simonmacdonald
>> 
>> 
>> 
>> On Thu, Dec 8, 2011 at 8:15 PM, Steven Gill <[email protected]> wrote:
>>> Just a reminder that code freeze and rc2 will be on Monday. I am going
>>> make a blog post for the changes in 1.3 when we release on Friday.
>>> 
>>> I will take a look at the short logs and issue tracker, but was wondering
>>> if any of you have anything to add other than general bug fixes.
>>> 
>>> Also thinking about doing a post on how to upgrade from 1.2 to 1.3.
>>> 
>>> -Steve
>>> 
>>> On 11-12-07 12:44 PM, "Brian LeRoux" <[email protected]> wrote:
>>> 
>>>> we need to be consistent on tag naming when we automate release building
>>>> 
>>>> 
>>>> On Wed, Dec 7, 2011 at 2:04 AM, Jesse <[email protected]> wrote:
>>>>> Windows Phone has been tagged
>>>>> https://github.com/callback/callback-windows-phone/tags
>>>>> However, It is tagged 1.3.rc1
>>>>> 
>>>>> On Thu, Dec 1, 2011 at 1:57 PM, Filip Maj <[email protected]> wrote:
>>>>> 
>>>>>> + ... 1 ?
>>>>>> 
>>>>>> On 11-12-01 1:11 PM, "Simon MacDonald" <[email protected]>
>>>>>> wrote:
>>>>>> 
>>>>>>> Do we need to vote on this? Sorry couldn't resist.
>>>>>>> 
>>>>>>> Simon Mac Donald
>>>>>>> http://hi.im/simonmacdonald
>>>>>>> 
>>>>>>> 
>>>>>>> On Thu, Dec 1, 2011 at 4:09 PM, Michael Brooks
>>>>>>> <[email protected]>wrote:
>>>>>>> 
>>>>>>>> Simon - I agree. I really like a release schedule that uses release
>>>>>>>> candidates and reserves a few days for solid testing. I appreciate
>>>>>> you
>>>>>>>> suggesting it for 1.3.0!
>>>>>>>> 
>>>>>>>> Ken - There's a JIRA and GitHub ticket for the issue, so we can
>>>>>> move the
>>>>>>>> conversation there. I could use some help testing it once the patch
>>>>>> is
>>>>>>>> in
>>>>>>>> place.
>>>>>>>> 
>>>>>>>> Michael
>>>>>>>> 
>>>>>>>> On Thu, Dec 1, 2011 at 1:05 PM, Simon MacDonald
>>>>>>>> <[email protected]>wrote:
>>>>>>>> 
>>>>>>>>> I have no problem with the change of tag name or you getting code
>>>>>> into
>>>>>>>> the
>>>>>>>>> release by the 12th. I'm just thinking we need to leave a few
>> days
>>>>>>>> 13-15
>>>>>>>> to
>>>>>>>>> do some testing and make sure we haven't broken anything.
>>>>>>>>> 
>>>>>>>>> Simon Mac Donald
>>>>>>>>> http://hi.im/simonmacdonald
>>>>>>>>> 
>>>>>>>>> 
>>>>>>>>> On Thu, Dec 1, 2011 at 4:03 PM, Michael Brooks
>>>>>>>> <[email protected]
>>>>>>>>>> wrote:
>>>>>>>>> 
>>>>>>>>>> I like it Simon.
>>>>>>>>>> 
>>>>>>>>>> I'd suggest tagging as "1.3.0rc1" instead of "1.3.0_rc1"
>>>>>>>>>> 
>>>>>>>>>> I would like to squeak in OS X support for BlackBerry. Should I
>>>>>> have
>>>>>>>> this
>>>>>>>>>> completed by Monday December 5th or Monday December 12th?
>>>>>>>>>> 
>>>>>>>>>> Michael
>>>>>>>>>> 
>>>>>>>>>> On Thu, Dec 1, 2011 at 12:44 PM, Simon MacDonald
>>>>>>>>>> <[email protected]>wrote:
>>>>>>>>>> 
>>>>>>>>>>> Hey all,
>>>>>>>>>>> 
>>>>>>>>>>> For the upcoming 1.3 release can we throw down a few dates?
>>>>>> Our
>>>>>>>> last
>>>>>>>>>>> release, 1.2, was tagged and released the same day. I can't
>>>>>> say
>>>>>>>> for
>>>>>>>>>> certain
>>>>>>>>>>> but I'm guessing the rush was to get it out before the Adobe
>>>>>>>>> announcement
>>>>>>>>>>> but we are lucky we didn't have major problems with that
>>>>>> release
>>>>>>>> as
>>>>>>>> we
>>>>>>>>>> were
>>>>>>>>>>> a bit light on end to end testing.
>>>>>>>>>>> 
>>>>>>>>>>> Since we are thinking about releasing 1.3 on December 16th I
>>>>>>>> thought
>>>>>>>>> I'd
>>>>>>>>>>> work back a bit to identify some milestones.
>>>>>>>>>>> 
>>>>>>>>>>> Dec 5th - Tag all repos as 1.3.0_rc1
>>>>>>>>>>> Dec 12th - Tag all repos as 1.3.0_rc2 and implement a code
>>>>>> freeze
>>>>>>>>>>> Dec 13th - Dec 14th - testing, testing, testing
>>>>>>>>>>> Dec 15th - Tag all repos as 1.3.0
>>>>>>>>>>> Dec 16th - package and release PhoneGap 1.3
>>>>>>>>>>> 
>>>>>>>>>>> Basically we shouldn't be adding new code the week of the
>> 12th
>>>>>>>> unless
>>>>>>>>> we
>>>>>>>>>>> have broken something that we discover doing regression
>>>>>> testing.
>>>>>>>>>>> 
>>>>>>>>>>> These are only suggestions folks but what do you think about
>> a
>>>>>>>> little
>>>>>>>>>> more
>>>>>>>>>>> process this time around?
>>>>>>>>>>> 
>>>>>>>>>>> Simon Mac Donald
>>>>>>>>>>> http://hi.im/simonmacdonald
>>>>>>>>>>> 
>>>>>>>>>> 
>>>>>>>>> 
>>>>>>>> 
>>>>>> 
>>>>>> 
>>> 
>> 

Reply via email to