2008/9/4 Claus Ibsen <[EMAIL PROTECTED]>: > Hi > > I would like to wait before forking. Camel 2.0 should be developed in the > dark fall/winter ;) > > I am sure you guys are also busy with the acquisition and what comes in such > a scenario. > > I propose to fork after 1.5 final and then create a 1.x branch for hot fixes.
Yeah - I like to try and minimise work branching/merging where possible. So I'd rather trunk becomes 2.0 as soon as we release 1.5 & we can make a 1.x branch whenever we need to make a change to the 1.5.0 code. But if folks want to hack something or experiment on a branch they're happy to do that & they can merge their stuff into trunk when it becomes the 2.0 branch. -- James ------- http://macstrac.blogspot.com/ Open Source Integration http://open.iona.com
