[ 
https://issues.apache.org/activemq/browse/CAMEL-1193?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Willem Jiang reassigned CAMEL-1193:
-----------------------------------

    Assignee: Willem Jiang

> Interceptors for multicast
> --------------------------
>
>                 Key: CAMEL-1193
>                 URL: https://issues.apache.org/activemq/browse/CAMEL-1193
>             Project: Apache Camel
>          Issue Type: Bug
>          Components: camel-core
>            Reporter: Suresh Inavolu
>            Assignee: Willem Jiang
>
> MulticastType override the method wrapProcessorInInterceptors() and adds a 
> StreamCachingInterceptor.
> This is giving a problem for the debugger in FUSE Integration designer. FID 
> debugger works using the Debug Interceptor, because we are not add an 
> interceptor for Multicast node, it will not stop at that node even if we 
> place a break point.
> camel-dev mailing list thread related to this: 
> http://www.nabble.com/Camel-Multicast-and-Interceptors-td21053645s22882.html

-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.

Reply via email to