Brian Dominic <[EMAIL PROTECTED]>
wrote:

>Having filled up the water tank we joined the queue for the two pairs
>of staircase locks down to the river. Because of the number of boats
>it took up well over a hour to get onto the river

Wouldn't BW let the barge locks be used to clear the queue?  

> Having rung in advance, Gloucester Lock was ready to
> lift us up into the docks

I bet that isn't what you meant to say.

Adrian

.

Adrian Stott
07956-299966

Reply via email to