> So as i'm not yet done, and given the code review needed, i'm wondering if
> it can make it into the 3.5.RC1, and if yes, what would be the deadline for
> the pull request to be issued?

The sooner the better!  :)

Given your description of the changes, perhaps a week would be
reasonable?  May 4th for the pull request?  May 11th is the RC1
deadline.

Bill




On Wed, Apr 11, 2012 at 4:09 AM, Frederic Esnault
<esnault.frede...@gmail.com> wrote:
> Hi all,
>
> I saw the planning for the releases of CAS 3.5 (RC1 and RELEASE).
> I was wondering what was the deadline for a pull request, about the
> implementation of OpenId Smart mode.
> I'm working on it currently, most of it being done. I'm facing a problem of
> a signature check failure at the end of the process, which is perfectly
> normal as the association handle is not the same. I still have a bit of work
> to sign correctly CAS requests.
> After that i'd like to perform a little bit of refactoring, and of course
> unit test my components.
> I also introduced a DelegatingController (similar to spring security or
> spring mvc delegating components), using a canHandle method to check if a
> controller is able to handle a request. This was needed to allow differents
> behavior to be mapped on the same url (/login).
> The ServiceValidateController now implements a new interface
> (DelegateController, defining the canHandle method), and implements it by
> answering true.
> This allows this kind of mapping (simplified xml) :
>
> <util:list id="delegates">
>     <entry key="smartOpenIdController" ref="smartOpenIdController"/>
>     <entry key="serviceValidateContrller" ref="serviceValidateController"/>
> </util:list>
>
> <bean id="delegatingController" class="o.j.c.w.DelegatingController">
>     <property name="delegates" ref="delegates"/>
> </bean>
>
> And the following handler mapping :
>
> <prop key="/login">delegatingController</prop>
>
>
> This is a small refactoring of CAS infrastructure, and do not break usual
> behavior but will need a code review on your side to be approved (or
> rejected).
>
> So as i'm not yet done, and given the code review needed, i'm wondering if
> it can make it into the 3.5.RC1, and if yes, what would be the deadline for
> the pull request to be issued?
>
> Frederic
>
> --
> You are currently subscribed to cas-dev@lists.jasig.org as: wgt...@gmail.com
> To unsubscribe, change settings or access archives, see
> http://www.ja-sig.org/wiki/display/JSG/cas-dev

-- 
You are currently subscribed to cas-dev@lists.jasig.org as: 
arch...@mail-archive.com
To unsubscribe, change settings or access archives, see 
http://www.ja-sig.org/wiki/display/JSG/cas-dev

Reply via email to