There is a setting for that .. Just look into the documentation..
Regards Am 29.02.2012 um 17:34 schrieb Chris <[email protected]>: > Say I have continuous integration every 5 mins. Say I have 10 files to > check in. After I check in my first file, and 5 seconds later, my > continuous integration just happen to trigger at the 5-min boundary, > before I check in my other 9 files. How can I set it up so I delay the > build for a specified amount of time after the first detection of an > out-of-date or missing file to give me time to checkin my other files? > Make sense? > > -chris
