Hi

it's not possible.
There can be only 1 Q for a project

keep in mind that the working directory would be the same if that option
existed.
files being overwritten on compile time
--> bad idea



with kind regards
Ruben Willems





On 18 December 2013 01:55, Barney <[email protected]> wrote:

> It's not entirely clear from the documentation or these posts, but is it
> possible to have more than one queue per project? Currently a build is
> triggered for a project and if a developer checks something in, a build for
> that CL won't be triggered until the current build finishes. In this case,
> I want two queues for this project (or more if I want) so the second CL is
> built in parallel to the first.
>
> Is this possible?
>
> --
>
> ---
> You received this message because you are subscribed to the Google Groups
> "ccnet-user" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to [email protected].
> For more options, visit https://groups.google.com/groups/opt_out.
>

-- 

--- 
You received this message because you are subscribed to the Google Groups 
"ccnet-user" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
For more options, visit https://groups.google.com/groups/opt_out.

Reply via email to